CI Flexo Printing Machine

Short Description:

Characteristic

  • The machine introduction & absorption of European technology / process manufacturing, supporting / full functional.
  • After mounting the plate and registration, no longer need registration, improve yield.
  • Replacing 1 set of Plate Roller (unloaded old roller, installed six new roller after tightening), only 20 Minute registration can be done by printing.
  • The machine first mount plate, pre-trapping function, to be completed in advance prepress trapping in the shortest possible time.
  • Maximum production machine speed up 200m/min, registration accuracy ±0.10mm.
  • The overlay accuracy does not change during lifting running speed up or down.
  • When machine stop, Tension can be maintained, the substrate is not deviation shift.
  • The whole production line from the reel to put the finished product to achieve non-stop continuous production, maximize product yield.
  • With precision structural, easy operation, easy maintenance, high degree of automation and so on, only one person can operate.

Product Detail

Product Tags

Product Video

Technical Specification

Model FDCI-1200
Printing materials Paper, woven bag or other similar material
Max unwinding diameter 1500mm
Printing width 300-800mm
Printing repeat 500-1200mm
Registration precision ±0.15mm
Registration range Horizontal±10mm Vertical±7.5mm
speed 0-200m/min
Printing plate thickness 2.28mm
Double-sided tape thickness 0.38mm
Ink type Water base ink
Electric heating Electric heating
Total power 120kw
Heating system power 45kw
Compressed air requirements 0.6Mpa
Dimension 6mx2.7mx2.5m

Exhibitions and Teamwork

product-description9

FAQ

Q: How to go to your factory?
A: We are located in Wenzhou, Zhejiang Province. To Wenzhou Longwan airport by Air, from Shanghai is about 45mins, from Guangzhou is about 1hr 50mins and from Hongkong is about 2hrs. We will pick up you in the airport.

Q: What’s the payment terms?
A: TT (30% deposit, the balance70% before delivery).

Q: How about the delivery time?
A: 45-60 working days after receiving the deposit

Q: How about the warranty?
A: Spare parts guarantee for one year from the date of installation.

Q:How about the after-sale service?
A:We can Send the technician for installation & training. But the buyer should pay the cost of air tickets and labour.


  • Previous:
  • Next:

  • Write your message here and send it to us

    Products categories